{"cited_by_count":233537,"description":"This cluster of papers focuses on the reliability assessment of wind power generation systems, including topics such as maintenance scheduling, probabilistic assessment, generation adequacy, security assessment, transmission planning, and the integration of energy storage. The research aims to evaluate and enhance the reliability of power systems incorporating wind energy.","display_name":"Power System Reliability and Maintenance","domain_id":"3","external_ids":{"openalex":"https://openalex.org/T11941","wikipedia":"https://en.wikipedia.org/wiki/Wind_power"},"field_id":"22","id":"T11941","keywords":[{"display_name":"power system reliability","id":"power-system-reliability","score":0.26,"url":"https://openalex.org/keywords/power-system-reliability"},{"display_name":"reliability index","id":"reliability-index","score":0.2321,"url":"https://openalex.org/keywords/reliability-index"},{"display_name":"distribution network reliability","id":"distribution-network-reliability","score":0.4725,"url":"https://openalex.org/keywords/distribution-network-reliability"},{"display_name":"SAIDI","id":"saidi","score":0.6757,"url":"https://openalex.org/keywords/saidi"},{"display_name":"SAIFI","id":"saifi","score":0.707,"url":"https://openalex.org/keywords/saifi"},{"display_name":"power system reliability assessment","id":"power-system-reliability-assessment","score":0.9146,"url":"https://openalex.org/keywords/power-system-reliability-assessment"},{"display_name":"loss of load probability","id":"loss-of-load-probability","score":0.4703,"url":"https://openalex.org/keywords/loss-of-load-probability"},{"display_name":"IEEE Reliability Test System","id":"ieee-reliability-test-system","score":0.6009,"url":"https://openalex.org/keywords/ieee-reliability-test-system"},{"display_name":"expected energy not supplied","id":"expected-energy-not-supplied","score":0.5683,"url":"https://openalex.org/keywords/expected-energy-not-supplied"},{"display_name":"energy not supplied","id":"energy-not-supplied","score":0.2876,"url":"https://openalex.org/keywords/energy-not-supplied"},{"display_name":"sequential Monte Carlo simulation","id":"sequential-monte-carlo-simulation","score":0.6883,"url":"https://openalex.org/keywords/sequential-monte-carlo-simulation"},{"display_name":"probabilistic load flow","id":"probabilistic-power-flow","score":0.2231,"url":"https://openalex.org/keywords/probabilistic-power-flow"},{"display_name":"loss of load expectation","id":"loss-of-load-expectation","score":0.7037,"url":"https://openalex.org/keywords/loss-of-load-expectation"},{"display_name":"CAIDI","id":"caidi","score":0.8499,"url":"https://openalex.org/keywords/caidi"},{"display_name":"probabilistic reliability assessment","id":"probabilistic-reliability-analysis","score":0.3021,"url":"https://openalex.org/keywords/probabilistic-reliability-analysis"},{"display_name":"transmission system reliability","id":"transmission-system-reliability","score":0.3698,"url":"https://openalex.org/keywords/transmission-system-reliability"},{"display_name":"power system adequacy","id":"power-system-adequacy","score":0.5246,"url":"https://openalex.org/keywords/power-system-adequacy"},{"display_name":"outage duration","id":"outage-duration","score":0.457,"url":"https://openalex.org/keywords/outage-duration"},{"display_name":"composite power systems","id":"composite-power-systems","score":0.813,"url":"https://openalex.org/keywords/composite-power-systems"},{"display_name":"forced outage rate","id":"forced-outage-rate","score":0.6322,"url":"https://openalex.org/keywords/forced-outage-rate"},{"display_name":"outage costs","id":"outage-costs","score":0.4943,"url":"https://openalex.org/keywords/outage-costs"},{"display_name":"customer interruption cost","id":"customer-interruption-cost","score":0.6184,"url":"https://openalex.org/keywords/customer-interruption-cost"},{"display_name":"20 kV distribution network","id":"20-kv-distribution-network","score":0.2044,"url":"https://openalex.org/keywords/20-kv-distribution-network"},{"display_name":"capacity credit","id":"capacity-credit","score":0.4652,"url":"https://openalex.org/keywords/capacity-credit"},{"display_name":"Roy Billinton Test System","id":"roy-billinton-test-system","score":0.6219,"url":"https://openalex.org/keywords/roy-billinton-test-system"}],"legacy_keywords":["Wind Power","Reliability Evaluation","Maintenance Scheduling","Power System","Probabilistic Assessment","Generation Adequacy","Security Assessment","Transmission Planning","Energy Storage","Composite Reliability"],"openalex_id":"https://openalex.org/T11941","source_created_date":"2024-01-23T15:27:12","source_updated_date":"2026-10-17T03:02:00","subfield_id":"2213","url":"/topics/T11941","works_api_url":"https://api.openalex.org/works?filter=topics.id:T11941","works_count":33407,"label":"Power System Reliability and Maintenance","provider":"openalex","revision":"28e5fafae15130f8","taxonomy_revision":"f050b5d4780b1289","title":"Power System Reliability and Maintenance","kind":"topic-directory","aeo_cohort":"topic-directory","catalogue_revision":"f050b5d4780b1289","numeric_address":"36249252334276157","address_version":"morton4x16-v1","coordinates":[3,22,2213,11941],"answer_status":"Directory metadata; local answer requires separate source review","truth_status":"Subject descriptor, not a factual answer or a demonstrated knowledge gap","reviewed_answer":null}