{"cited_by_count":674881,"description":"This cluster of papers focuses on the application, benefits, challenges, and future trends of Building Information Modeling (BIM) in the construction industry. It covers topics such as BIM implementation, prefabrication, sustainability, facilities management, IoT integration, risk management, off-site construction, RFID technology, and lean construction.","display_name":"BIM and Construction Integration","domain_id":"3","external_ids":{"openalex":"https://openalex.org/T11006","wikipedia":"https://en.wikipedia.org/wiki/Building_information_modeling"},"field_id":"22","id":"T11006","keywords":[{"display_name":"building information modeling","id":"building-information-modeling","score":0.6525,"url":"https://openalex.org/keywords/building-information-modeling"},{"display_name":"lean construction","id":"lean-construction","score":0.6358,"url":"https://openalex.org/keywords/lean-construction"},{"display_name":"prefabrication","id":"prefabrication","score":0.3472,"url":"https://openalex.org/keywords/prefabrication"},{"display_name":"BIM adoption","id":"bim-adoption","score":0.9736,"url":"https://openalex.org/keywords/bim-adoption"},{"display_name":"construction productivity","id":"construction-productivity","score":0.3647,"url":"https://openalex.org/keywords/construction-productivity"},{"display_name":"Autodesk Revit","id":"autodesk-revit","score":0.6797,"url":"https://openalex.org/keywords/autodesk-revit"},{"display_name":"digitalization of construction","id":"digitalization-of-construction","score":0.6537,"url":"https://openalex.org/keywords/digitalization-of-construction"},{"display_name":"modular construction","id":"modular-construction","score":0.3105,"url":"https://openalex.org/keywords/modular-construction"},{"display_name":"construction automation","id":"construction-automation","score":0.4007,"url":"https://openalex.org/keywords/construction-automation"},{"display_name":"BIM implementation","id":"bim-implementation","score":0.9765,"url":"https://openalex.org/keywords/bim-implementation"},{"display_name":"construction planning","id":"construction-planning","score":0.204,"url":"https://openalex.org/keywords/construction-planning"},{"display_name":"industrialized construction","id":"industrialized-construction","score":0.4028,"url":"https://openalex.org/keywords/industrialized-construction"},{"display_name":"building life cycle","id":"building-life-cycle","score":0.2654,"url":"https://openalex.org/keywords/building-life-cycle"},{"display_name":"Industry Foundation Classes","id":"industry-foundation-classes","score":0.825,"url":"https://openalex.org/keywords/industry-foundation-classes"},{"display_name":"information technology in construction","id":"information-technology-in-construction","score":0.5898,"url":"https://openalex.org/keywords/information-technology-in-construction"},{"display_name":"offsite construction","id":"off-site-construction","score":0.6681,"url":"https://openalex.org/keywords/off-site-construction"},{"display_name":"construction robotics","id":"construction-robotics","score":0.3569,"url":"https://openalex.org/keywords/construction-robotics"},{"display_name":"AEC industry","id":"aec-industry","score":0.6371,"url":"https://openalex.org/keywords/aec-industry"},{"display_name":"construction efficiency","id":"construction-efficiency","score":0.262,"url":"https://openalex.org/keywords/construction-efficiency"},{"display_name":"IFC","id":"ifc","score":0.6332,"url":"https://openalex.org/keywords/ifc"},{"display_name":"prefabricated buildings","id":"prefabricated-buildings","score":0.414,"url":"https://openalex.org/keywords/prefabricated-buildings"},{"display_name":"quantity takeoff","id":"quantity-take-off","score":0.794,"url":"https://openalex.org/keywords/quantity-take-off"},{"display_name":"BIM adoption barriers","id":"bim-adoption-barriers","score":0.9808,"url":"https://openalex.org/keywords/bim-adoption-barriers"},{"display_name":"construction information management","id":"construction-information-management","score":0.7912,"url":"https://openalex.org/keywords/construction-information-management"},{"display_name":"construction waste reduction","id":"construction-waste-reduction","score":0.347,"url":"https://openalex.org/keywords/construction-waste-reduction"}],"legacy_keywords":["BIM","Construction","Prefabrication","Sustainability","Facilities Management","IoT Integration","Risk Management","Off-Site Construction","RFID Technology","Lean Construction"],"openalex_id":"https://openalex.org/T11006","source_created_date":"2024-01-23T15:27:09","source_updated_date":"2026-10-17T03:02:00","subfield_id":"2215","url":"/topics/T11006","works_api_url":"https://api.openalex.org/works?filter=topics.id:T11006","works_count":121643,"label":"BIM and Construction Integration","provider":"openalex","revision":"98aded792404c2f4","taxonomy_revision":"f050b5d4780b1289","title":"BIM and Construction Integration","kind":"topic-directory","aeo_cohort":"topic-directory","catalogue_revision":"f050b5d4780b1289","numeric_address":"36240456376028917","address_version":"morton4x16-v1","coordinates":[3,22,2215,11006],"answer_status":"Directory metadata; local answer requires separate source review","truth_status":"Subject descriptor, not a factual answer or a demonstrated knowledge gap","reviewed_answer":null}