{"id":"S85107211","label":"Production control","description":"Here are entered works on procedures for planning, routing, scheduling, dispatching, and expediting the flow of materials, parts, and assemblies within a plant from the raw state to the finished product in an orderly and efficient manner.","source_url":"https://id.loc.gov/authorities/subjects/sh85107211","normalized_label":"production control","broader":["http://id.loc.gov/authorities/subjects/sh85046854","http://id.loc.gov/authorities/subjects/sh85065864","http://id.loc.gov/authorities/subjects/sh85065889"],"aliases":["Control, Production"],"source_identifier":"http://id.loc.gov/authorities/subjects/sh85107211","provider":"lcsh","revision":"2bbfa32b2b201a4b","taxonomy_revision":"f050b5d4780b1289","title":"Production control","url":"/topics/S85107211","kind":"topic-directory","aeo_cohort":"topic-directory","catalogue_revision":"f050b5d4780b1289","numeric_address":"324479351448027648","address_version":"morton4x16-v1","coordinates":[0,20,19080,11264],"answer_status":"Directory metadata; local answer requires separate source review","truth_status":"Subject descriptor, not a factual answer or a demonstrated knowledge gap","reviewed_answer":null}