{"id":"S85021486","label":"Cave architecture","description":"Here are entered works on structures built into existing caves. Works on structures built by excavating rock formations are entered under [Rock-cut architecture.]","source_url":"https://id.loc.gov/authorities/subjects/sh85021486","normalized_label":"cave architecture","broader":["http://id.loc.gov/authorities/subjects/sh85006611"],"aliases":["Grotto architecture"],"source_identifier":"http://id.loc.gov/authorities/subjects/sh85021486","provider":"lcsh","revision":"c80500d52f7e04d7","taxonomy_revision":"f050b5d4780b1289","title":"Cave architecture","url":"/topics/S85021486","kind":"topic-directory","aeo_cohort":"topic-directory","catalogue_revision":"f050b5d4780b1289","numeric_address":"9550028162621130240","address_version":"morton4x16-v1","coordinates":[0,20,17740,47104],"answer_status":"Directory metadata; local answer requires separate source review","truth_status":"Subject descriptor, not a factual answer or a demonstrated knowledge gap","reviewed_answer":null}